| Acton | ~$686.6K all-home median sale in Apr 2026 | ~49-60 min to North Station from South Acton on the MBTA Fitchburg Line, Zone 6; ~42 min driving off-peak via Route 2 | 83% ELA · 82% Math 94.4% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Ashland | ~$609K median sale in Apr 2026 | Ashland station, Zone 6: roughly 35–40 min peak to South Station, 30–35 min to Back Bay; 678 parking spaces at $4/day | 71% ELA · 70% Math 91.5% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Belmont | ~$1.35M median sale, Apr 2026 | Zone 1 Fitchburg Line: Belmont Center to North Station ~14-15 min peak; Waverley roughly 3 min longer; limited Belmont Center permit parking | 81% ELA · 81% Math 96.7% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Boxborough | ~$773K typical home value, Apr 2026 | No in-town rail; drive to South Acton (Zone 6) or Littleton/495 (Zone 7) on the Fitchburg Line, then ~50-70 min to North Station depending on train | 83% ELA · 82% Math 94.4% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Brookline | ~$1.5M median sale in spring 2026 | Green Line C and D branches; roughly 15-30 min to downtown or Longwood depending on station, with no in-town commuter rail | 83% ELA · 84% Math 95.9% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Concord | ~$1.38M median sale, Apr 2026 | Fitchburg Line zone 5 from Concord or West Concord to North Station, typically ~30-40 min; driving via Route 2/I-95 varies by peak traffic | 84% ELA · 81% Math 96.8% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Dover | ~$2.05M median sale, early 2026 | Drive-only town — no in-town commuter rail; nearest station is Needham Junction or Needham Heights on the MBTA Needham Line (~40–45 min to South Station); ~45–60 min driving via Route 109 to I-95/128 or Route 16 to I-95 | 91% ELA · 87% Math 98.1% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Framingham | ~$728K median sale, March 2026 | Framingham station, Worcester Line Zone 5; roughly 45 min peak / 55 min off-peak to South Station | 37% ELA · 40% Math 74.3% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Grafton | ~$590K median sale, April 2026 | ~70–75 min to South Station on the Framingham/Worcester Line; I-90 via Exit 96 (Millbury) adds drive option | 58% ELA · 51% Math 93.6% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Holliston | ~$730K median sale, early 2026 | Drive-to-rail via Ashland (~6–8 min) or Framingham (~15 min) on the Worcester Line; ~50–60 min to South Station. Drive-only via Mass Pike (I-90) from Framingham ~45–55 min off-peak. | 74% ELA · 76% Math 95.1% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Hopkinton | ~$1.12M median sale, Apr 2026 | No in-town rail; drive to Southborough or Westborough (Zone 6) on the Worcester Line, then ~50-70 min to South Station depending on train | 84% ELA · 80% Math 95.8% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Hudson | ~$580K–$680K median sale range, mid-2026 | No commuter rail in Hudson; drive ~10 min to Southborough (Worcester Line, Zone 6) or ~15 min to Westborough; drive to Boston ~50–60 min via I-495/Mass Pike | 52% ELA · 33% Math 87.4% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Lexington | ~$1.66M median sale, early 2026 | No commuter rail; MBTA Routes 62 and 76 to Alewife (Red Line); Route 2 and I-95/128 by car; 30–50 min driving off-peak | 84% ELA · 87% Math 98.2% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Lincoln | ~$1.8M–$2.4M range signal, mid-2026 | ~40–45 min to North Station on the MBTA Fitchburg Line (Lincoln station); Route 2 and I-95/128 for drivers | 76% ELA · 78% Math 98% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Marlborough | ~$650K median sale, early 2026 | No station in Marlborough; drive ~10 min or free shuttle to Southborough (Worcester Line) for ~55–65 min to South Station; or drive 40–65 min via I-495/Mass Pike | 40% ELA · 34% Math 90.7% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Medfield | ~$1.15M median sale, spring 2026 | Drive-to-rail: ~50–55 min to South Station via Walpole (Franklin Line); 45–60 min driving via Route 109 to I-95/128 | 73% ELA · 79% Math 96.7% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Milford | ~$535K–$590K, mid-2026 | Drive-only town: ~46–60 min to Boston via I-495 + I-90 (Mass Pike) off-peak; drive to Forge Park/495 for Franklin Line (~60–65 min to South Station) ([MBTA](https://www.mbta.com/schedules/CR-Franklin)) | 41% ELA · 31% Math 79.7% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Natick | ~$960K median sale, early 2026 | ~44–55 min to South Station on the Framingham/Worcester Line (Natick Center or West Natick stations); 35–55 min driving via Mass Pike (I-90) or Route 9 | 71% ELA · 70% Math 94.9% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Needham | ~$1.3M–$1.9M depending on area and property type, early 2026 | ~42–45 min to South Station on the MBTA Needham Line; ~35–50 min driving via I-95/Route 128 or Route 9 | 85% ELA · 84% Math 97.9% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Newton | ~$1.5–1.6M median sale, early/mid 2026 | ~25–35 min to downtown Boston via MBTA Green Line D (Riverside branch) or Worcester Line commuter rail; Mass Pike I-90 direct | 77% ELA · 79% Math 95.5% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Northborough | ~$735K–$835K range, early/mid 2026 | No MBTA station in town — drive ~10 min to Westborough or Southborough station on the Worcester Line; ~60–75 min to South Station by rail; ~55–75 min driving via I-290/I-495 or Route 9 | 78% ELA · 71% Math 97.7% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Sherborn | ~$1.09M median sale, April 2026 | ~55–75 min drive to Boston; drive to Framingham or Natick Center on the Worcester Line (~49 min to South Station from Framingham) | 91% ELA · 87% Math 98.1% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Southborough | ~$1.1M median sale, early 2026 | ~60–70 min to South Station on the Framingham/Worcester Line (Zone 6); 35–50 min driving via Mass Pike (I-90) | 78% ELA · 71% Math 97.7% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Sudbury | ~$1.1M median sale, early 2026 | Drive-only town: 45–65 min driving via Route 20 / Mass Pike or Route 2; drive to West Concord or Framingham for MBTA rail | 76% ELA · 78% Math 98% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Upton | ~$770K median sale, early 2026 | No MBTA stop in Upton; drive ~15–20 min to Grafton or Westborough (Worcester Line) then ~70–75 min to South Station; or drive ~50–65 min via I-495 / Mass Pike | 58% ELA · 44% Math 93.8% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Wayland | ~$1.1M median sale, early/mid 2026 | No commuter rail in town — drive to Natick Center, West Natick, or Framingham (~39–49 min to South Station); ~45–65 min driving via Mass Pike or Route 30/Route 9 | 82% ELA · 86% Math 97.3% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Wellesley | ~$1.8M median sale, early 2026 | ~27–34 min to South Station on the Framingham/Worcester Line (three stations: Wellesley Farms, Wellesley Hills, Wellesley Square); Route 9 and I-95/128 for drivers | 77% ELA · 81% Math 95.3% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Westborough | ~$660K median sale, early 2026 | ~55–65 min to South Station on the MBTA Framingham/Worcester Line (Zone 7); 45–65 min driving via Mass Pike (I-90), with I-495 and I-290 adding regional flexibility | 81% ELA · 79% Math 95.4% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Weston | ~$2.1M–$2.8M median sale, early/mid 2026 | ~50–60 min to North Station via Fitchburg Line flag stops (Kendal Green, Silver Hill); ~30–50 min driving via I-90/I-95 interchange | 81% ELA · 82% Math 97.7% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |
| Winchester | ~$1.4M–$1.5M median sale, early–mid 2026 | ~19–22 min to North Station on the MBTA Lowell Line (Winchester Center or Wedgemere stations); 20–35 min driving via I-93 | 80% ELA · 77% Math 96% grad · MA DESE 2025 MCAS / 2025 graduation / 2025-26 enrollment |